loader image

HiThermCon

HIGH TECHNOLOGY INDUSTRIAL FURNACE SYSTEMS

Degassing Systems

TEKNİK ÖZELLİKLERİ

  • Kapak: Before degassing aluminum melts by deaerating 0:25 to 12:30 cc / 100 g, which after receiving the amount of hydrogen gas 0:15 to 12:20 cc / 100 g is reduced to the order.
  • Gaz Besleme: Na, K, to remove impurities such as alkaline Li R 3-5% N2, Cl process gas is used.
  • Homojen Kontrol: 2 in SiC heating elements for the heating process is bulunnak SiAlON protective tube.
  • Hidrojen Oranı: 0.12-0.20 cc/100 gr

 Kapasite ölçüleri müşteri ihtiyacına göre belirlenmektedir. İhtiyacınız doğrultusunda daha detaylı bilgi alabilmek için lütfen bizimle irtibata geçiniz.

Rate our product with a score between 1 and 10 »
* We would be very happy if you can explain why you scored us so, in the "Message / Comment" section.
* The default value 0 (zero) will be ignored!

Degassing Systems | Get in contact with us about this product.

Our product tree, where you can easily access all our products, is in this menu.

en_USEnglish